Veneer Stone Mold VS 401, 22" x 16.5"
Stone Veneer Molds VS 401/1, 401/2
Cultured Veneer Stone
Mold size - 2,47 SQ.FT. (0.23 m2) approximate.
Measurements - 22" x 16 1/2" x 1" (57 cm x 42 cm x 2.5 cm)
Mold Sections - 5
Section dimensions: Approx. size of section 16" x 4" x 3/4" (40 cm x 10 cm x 2 cm).
Stone Veneer Molds VS 401/3 Corner Mold
Cultured Veneer Stone
Mold size - 1.61 SQ.FT. (0.15 m2) approximate.
Measurements - 17" x 13 1/2" x 1" (44 cm x 34 cm x 2.5 cm)
Mold Sections - 3
Section dimensions: Approx. size of section 16" x 4" x 3/4" (40 cm x 10 cm x 2 cm).
VS 401/3 - 2 in 1 mold. Mold can be used to cast flat stones or corner stoned
To have a wider stone pattern variety we recommend buying these molds together.
VS 401 Stone-casting Instructions:
Always apply release agent to your mold prior to casting concrete.
VS 401/1, 401/2, 401/3 mold casting weight is about 20.06 lbs (9.13 kg)
We use this 1:2 cement to filler ratio mix: (you can also mix 1-part Portland cement to 3 parts sand (filler), but plasticizer and water has to be re-calculated by cement weight)
- 6.67 lbs (3.04 kg) Portland cement (white for light stone colors, gray for dark stone colors)
- 13.38 lbs (6.07 kg) Sand (20-30 mesh recommended. Silica sand or "all-purpose" sand works great)
- 26.76 oz (0.72 l) Water. We recommend water to be 20%-30% of cement weight. If your mix is too liquid, use less water
- 1.07 oz (30.45 g) super-plasticizer (Superplasticizer's dosage rate is 0.5%-1% of cement weight. We are using 1%)
For best result always add dry pigments to your mix prior to adding the water. Mix concrete with pigment and additives for a few minutes, then add water (mix at least 3-5 minutes). You can also add Super plasticizer to the water 10-15 minutes prior to casting, then mix with dry ingredients.
Please note: Concrete minimum mixing time is 3 minutes (it takes a few minutes until Super Plasticizer absorbs into the cement and start reaction)
To color different molds sections, brush oxide pigment over the selected sections, then cast the concrete.