Paver stepping stone molds PS 30091
Approximate Mold inside measurement: 13 3/4" X 13 3/4" X 2" (35 cm X 35 cm X 5 cm)
How to Make Concrete Stone Instruction
PAVER STONE PLASTIC MOLDS
Application areas for paving stones include residential terrace, schools, traffic and pedestrian walkways, road embankments, industrial and commercial buildings, landscape for open and closed court yards, churches and mosques.
1. Plastic paver molds produce smooth and high quality paver stones and paver tiles.
2. Different patterns of paver stone and tile molds are available for precast concrete process.
3. Paver stones and tiles can be manufactured with a minimum infrastructure.
4. Paver molds are in different shapes (square, rectangle and interlocking) and sizes.
PS 30091 Stone-casting Instructions:
Always apply release agent to your mold prior to casting concrete.
PS 30091 mold casting weight is about 9.75 lbs. (4.43 kg.)
We
use this 1:2 cement to filler ratio mix : (you can also mix 1-part
Portland cement to 3 parts sand [filler], but plasticizer and water has
to be re-calculated by cement weight)
3.25 lbs (1.48 kg) Portland cement (white for light stone colors, gray for dark stone colors)
6.5 lbs (2.95 kg) Sand (20-30 mesh recommended. Silica sand or "all-purpose" sand works great)
13 oz (0.35 L) Water (We recommend water to be 20%-30% of cement weight.) (If your mix is too liquid, use less water.)
0.52 oz (14.76 g) Super-plasticizer (Superplasticizer's dosage rate is 0.5% -1% of cement weight. We are using 1%)
For best result always add dry pigments
to your mix prior to adding the water. Mix concrete with pigment and
additives for a few minutes, then add water (mix at least 3-5 minutes).
You can also add Super plasticizer to the water 10-15 minutes prior to
casting, then mix with dry ingredients.
Please note: Concrete minimum
mixing time is 3 minutes (it takes a few minutes until Super
Plasticizer absorbs into the cement and start reaction)
To color different molds sections, brush oxide pigment over the selected sections, then cast the concrete.
Cover the mold with plastic while it is curing. Remove the stone from the mold in 12-24 hours